• Home
  • Contact Us
  • Advertise with IFI
  • Get IFI Free
  • Download IFI Issues Now
  • 2010 Mediapack
  • Upcoming Events

    • View more events »
2010 Show Directory

Advertisement

Large order for Söderhamn Eriksson

Posted on November 27th, 2007

Söderhamn Eriksson has signed a contract with James Jones & Sons in Scotland for the delivery of machinery worth some €11 million. The order comprises debarking, log intake, sawline, edging and waste handling.

The sawline features the most advanced technology for log and cant feeding, reducing, band sawing and edging and will produce 140,000 cu/m lumber/shift and year with full optimisation.

Great emphasis has been given to the creation of a processing line that minimises production cost through optimization of the profit obtained from each log and through maximum versatility.

James Jones & Sons is investing a total of about EUR 55 million in the new plant at its sawmill in Lockerbie. The company has a turnover of more than €100 million and 495 employees.

By investing in the new sawline, which will be one of Europe’s most modern and technically advanced, James Jones & Sons reinforces its role as an important actor on the British sawmill market. This sawline will be the fifth plant Söderhamn Eriksson has delivered to James Jones & Sons.

The machinery will be shipped early in 2009 and started up on September 1 of the same year.

Search IFI Articles

Recent News

  • Ponsse’s new feed roller solutions enhance the multi stemming EH25 energy wood harvester head
    IFI - 9/09/10
  • Deere Reports Third-Quarter Earnings of $617 Million
    IFI - 9/09/10
  • Komptech challenges operators to duel.
    IFI - 10/08/10
  • Archive of all articles »
© Copyright 2007 - 2010 International Forest Industries. All rights reserved.